Predicting remaining useful life of boiler by evaluating design data, operating data, non destructive examination (NDE) data, and destructive examination data to help power plant/ utility manager:
- Preventing catastrophic damage
- Outage interval extension
- Safe operating condition
- Ensure plant utilities
Our Boiler Assessment Personals certified NDE level 1,2 by ASNT and wide range experience Steam, Combine Cycle, Hydro, Coal, Solar Power Plant Turbine from < 50 MW , 50 â 300 MW & > 300 MW.
Boiler Assessment Webinar Series
Learn about some of the most common failure mode, method and cases power generation/ other utility industry issues and PJB’s assessment solutions for resolving them. Access the 7-part webinar series.